NYC Building Upcoming Changes
Posted onMarch DOB NOW: Build Requirement for Building Plan Submissions Effective April 9, 2018, all building plans submitted in DOB NOW: Build will be required to include the DOB NOW job number, with the extension that indicates initial (I1), amendment (P1) or subsequent (S1) etc., on the lower right hand side of each drawing sheet. […]



